Skip to content

Thing

MJOLNIR Shield Tester

The Shield Tester is a piece of machinery in use by the UNSC engineers to bring…

The Shield Tester is a piece of machinery in use by the UNSC engineers to bring online inactive MJOLNIR armor energy shielding.

John-117 in a Shield Tester on the Pillar of Autumn.
John-117 in a Shield Tester on the Pillar of Autumn.

Function

First mentioned in the Halo: The Fall of Reach novel, during the MJOLNIR Mark V's first mission, this device charged the armor's shield before they were activated by John-117, like a battery. In Halo: Combat Evolved, the tester makes the same noise as a Plasma Pistol overcharge impact, possibly hinting that they were made using scavenged Covenant technology.

It is unknown why the shields need an initial charging. Cryostasis may be a logical explanation for Halo: Combat Evolved, but the MJOLNIR Mark VI in Halo 2 had no such explanation. It is possible that the fusion power cell needed to reach a certain internal temperature to begin it's reaction and the initial charging gives it the energy to do so, or the new suit still had to be started up fully.

Sources

Adapted from the original article, under CC BY-SA 3.0.

What readers think

Halo

Text under CC BY-SA 3.0

Report